This page is old; please merge its content into the Wiki and delete it!
EGEE09_Report
EGEE09 Report
Dates: 21-25 September 2009, Barcelona, Spain
Programm and Slides
Report from individual tracks
Chimera ARC SE
competitor of d-cache and DPM
no chances
could give a try as an alternative for ARC_SE
not in production yet
claimed to be ARC0 compatible but several modules could relay on ARC1
Security and SW lifecycle
NDGF sw lifecycle
reinforce collaboration influencing the development
be involved in dev to influence more the features one need
Specialized Support Centers
Earth Science SSC
Envirogrid
Climte-G testbed
portal for accessing and visualizing data.
UniGe involved (need to contact)
Compchem Activities
Chempo portal
from .pl
seems lot of use cases to be ported
most of them quite complex as they relay on Vector or MMP systems
interesting idea (from user community) to make an effort in re-factoring algorithm and applications
Helthgrid SSC
EGI will take only 2nd line support
SSC have to take up 1st line
1st line deals with ALL problems. (SSC)
2nd line deals with ALL problems 1st line cannot deal with. (EGI)
Not clear ideas on how support will be organized
Elixir project as one of large user group: [http://www.elixir- europe.org/page.php?page=home][3]
50% funding model from EU
100% direct costs
7 - 60 % indirect costs
estimate current proposal (joint?) already exceed 2M Euro
HEP SSC
ROSCOE will be the umbrella as well as catch all for all services/activities that could be linked together from different SSCs.
HEP as 180PM for operation = 15FTEs
HEP will continue operational and certification and integration effort funded in SSC.
1.2.1.2 (services)
1.2.3 (HEP SSC)
Overall SSC discussion
25M total of EC contribution
1.2.1.1
1.2.1.2
Most likely EGI project will be stretched from 3 to 4 years with same total from EU funds (still has to be seen whether this affects also SSCs)
SSCs will have to adapt to this in case this will affect them.
New SSC emerged:
Scientific Gateway proposal as separate SSC
Application porting SSC
Training and Dissemination SSC - ~ 13FTEs
Many of them have been criticized as they aimed to cover most of the SSC core activities
Contact Scientific Gateway SSC explaining our position in CH as enabler for Chemistry and LifeScience workflows (foresee 24 - 36 PM over 4 years -> 0.5 - 0.75 FTEs )
Contact Sandro Fiore and Giovanni Aloisio for portal they have realized in Envirogrid project
- we could probably drop from Training and Porting from 36 to 24 over 4 year ( 0.5 FTE of which 50% funded by EU )
Training and dissemination in CCMST SSC: we have 9PM in it ( 3PM per 3 year -> 2PM per 4 year ) -> 0.25 FTEs or 0.2 FTEs
Feedback for GC3
GC3 needs to get closer to CCMST SSC contacts for a better writing of the proposal
We need to understand what will be centralized in terms of Scientific Gateway, Application Porting and Training and Dissemination.
We probably need to reduce our contribution and, probably, shrink it over 4 years in CCMST SSC
Application porting: we already reduced our effort in it ( 9PM )
Portal and workflows: 27PM ( 9PM per 3y ears -> 6.7PM over 4 years )
[3]: http://www.elixir-europe.org/page.php?page=home (http://www.elixir- europe.org/page.php?page=home)